Pipe drilling part - allows installation of the Seco / FIP flow sensor on the pipeline.
Designed for monitor of control of control 100
Accuracy +-8 %, temperature 80 & deg; c, pressure 10 bar
Flow sensor F3.H15, IP65 connector - installation in the drill part 125-225 + 315 mm
Flow sensor F3.H01, 8m cable - installation in drilling part 50-110 + 250 mm
Flow sensor F3.H03, 8m cable - Installation in the drill part 125-225 + 315 mm
Flow sensor F3.H13, IP65 connector - installation in drilling part 50-110 + 250 mm
Control monitor K100 Wall installation and RS485 output, without cover box IP65
Control monitor K100 Wall installation, without cover box IP65
FLS M9.02 Wall installation monitor, cover box IP65
Magnetometer F6.63.09 (50--110 mm + 250 mm)-Puls/Freq/MA Outputs
Magnetometer F6.63.11 (125-225 mm + 315 mm)-pulse/freq/ma outputs
Settings